網頁

2021-05-23

EUREKA:為什麼中央疫情指揮中心CECC公佈的修訂數字會涵蓋6-7天?

【縛雞之見】

Eureka: Why the revised figures published by the CECC are covering 6-7 days?
1.  The specimens that the local governments sent to the Central Epidemic Command Center (CECC), according to the law, are on a daily basis, meaning the front line local governments have to send examples as quickly as possible once the front lines collect them.
2.  The CECC’s receiving and the inspection for those specimens must be sequential, under the "First in first out" principle.
The above assumptions lead to a result: The CECC's daily revision figures must be sequential and spanning no more than two days time.
However, the CECC put out the daily revisions spanning not 1-2 days but ranging up to 6-7 days.
Only one occasion meets the contradictory phenomena:  The CECC is outsourcing the inspection, while it does not admit.

為什麼中央疫情指揮中心CECC公佈的修訂數字會涵蓋6-7天?
1. 
根據法律規定,地方政府送至中央疫情指揮中心CECC的標本是按日計算的,也就是說,前線的地方政府在收集到標本後,要儘快送來CECC
2. 
根據「先進先出」原則,CECC對這些樣本的接收和檢查必須是循序處理的
上述假設導致了一個結果。CECC的每日修訂數字必須是連續的,而且時間跨度不超過兩天。
然而,CECC公佈的每日修訂資料不是跨越1-2天,而是跨越6-7。(5/225/23
只有一種情況符合這種矛盾的現象:CECC將檢查工作外包出去,而它卻不承認。(中文由DeepL翻譯,Taimocracy修正)


沒有留言:

張貼留言

請網友務必留下一致且可辨識的稱謂
顧及閱讀舒適性,段與段間請空一行